问题描述:
[单选]
In readying an auxiliary water-tube boiler for a routine hydrostatic test, which of the following procedures should be undertaken prior to filling the boiler with fresh water?
A.The safety valve escape piping should be disconnected from the valve body and a blank inserted
B.The boiler vent valves should be opened
C.All handhole/manhole covers should be tightened up as much as possible to preclude any leaks
D.All of the above
参考答案:查看无
答案解析:无
☆收藏
答案解析:无
☆收藏
上一篇:Which of the following conditions could cause the feed pump for an auxiliary boiler to lose suction?
下一篇:The fuel supply system to an automatic auxiliary boiler, will be automatically shutdown if the boiler()
- 我要回答: 网友(18.224.64.18)
- 热门题目: 1.目前国内外均以(S+D)/2 2.将主轴颈下沉量视为主轴承下瓦 3.新造柴油机台架安装或在船上安